Lido Pool

Work has begun on replacing the floor of the Lido Pool.  The old asphalt floor will be removed and replaced with a cement bottom.  This is the final step in the ongoing renovations at the pool.  We are so proud of our beautiful Lido Pool and Public Washroom .

Here’s hoping for a long warm summer…………

Share this Page:
  • Print
  • Facebook
  • Twitter
  • email
This entry was posted in Lido, News. Bookmark the permalink.